Long Canyon Gold Mine
- Market SectorIndustrial & Mining
- Size72,800 sq. ft.
- Project LocationWells, Nevada
- CompanyConstruction
- DescriptionBig-D Construction was contracted as the Design-Build contractor to lead the complex, multi-phased design and construction of all the facilities and supporting infrastructure for the new Long Canyon Gold Mine. The construction portion of the project included fueling/propane and storage silo pads, leach pond, and construction of 12 pre-engineered metal building structures. The project was completed under budget and ahead of schedule. Long Canyon Mine Buildings Administration Building – 16,300-sf Truck Wash Building – 7,300-sf Truck Shop Building – 31,000-sf Geology Lab – 4,600-sf CIC Process Building – 9,600-sf CIC Process Admin Building – 1,700-sf Ambulance Shed – 1,200-sf Guard Shack – 300-sf Well Buildings – 200-sf (4 each)