fbpx Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter Asset 1 Self Performed Building 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Self-Performed Services single-blue-chevron-left Office Signature double-blue-chevron-left Light Commercial single-chevron-gray-left single-white-chevron-left solid arrow right
13 Jul

Weber State University Topping Out Ceremony

Big-D Construction along with Weber State University, VCBO Architecture, and other trade partners, participated in the “Topping Out” ceremony of the new Noorda Engineering, Applied Science & Technology building on Monday.

Painted purple and signed by several involved in the project, onlookers including future Big-D employees, watched as the final beam was hoisted into place. Affixed to the beam was an American flag on one end and an evergreen tree on the other; a tradition which dates back centuries and, depending on who you ask, is rumored to date back to Egypt and the construction of the pyramids.
Situated on the north end of the campus, the Noorda Engineering Building will serve as the new home for the College of Engineering, Applied Science and Technology (EAST). Stay tuned….construction is expected to be complete Fall 2022.

Owner: Weber State University
Builder: Big-D Construction
Architect: VCBO Architecture
https://www.standard.net/…/article_312df0a0-d930-5227…