Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Office double-blue-chevron-left Light Commercial Self Performed Building Self-Performed Services Signature single-blue-chevron-left single-chevron-gray-left single-white-chevron-left BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter solid arrow right Asset 1
Project Weber State University North Endzone
Owner Weber State University


Project Size

27,000 sq ft

Project Dates

13 months

Project Location

Ogden, Utah
Weber State University

Project Description

Weber State University Athletics is excited to announce the construction of a state-of-the-art athletic complex at the north end of Stewart Stadium. The building will include the Barbara and Rory Youngberg Football Center, the Sark’s Boy’s Gateway, the Stromberg Strength and Conditioning Complex, the Marquardt-Kimball Plaza and the Behnken Plaza.  The 27,000-square foot building will surround the Chick Hislop track on the north side and will serve as the main entrance to the stadium.
The facility includes a new state-of-the-art strength and conditioning facility for all Wildcat student-athletes. It also features new football team locker rooms and a new expanded football equipment room, in addition to football coaches’ offices and position group meeting rooms. The building includes a 125-seat team room that will benefit all student-athletes. A new plaza, ticket office, and souvenir was also constructed.