fbpx Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter Asset 1 Self Performed Building 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Self-Performed Services single-blue-chevron-left Office Signature double-blue-chevron-left Light Commercial single-chevron-gray-left single-white-chevron-left solid arrow right
Project Traverse Mountain Office Building #2
Owner Traverse Mountain Commercial Venture, LLC


Project Size

414,775 sq ft

Project Dates

16 months

Project Location

Lehi, Utah
Traverse Mountain Commercial Venture, LLC

Project Description

The Traverse Mountains separates the Salt Lake Valley and Utah Valley in the state of Utah. Over the past decade, the area has seen a huge housing and commercial development due to its location off I-15. Tax incentives have also attracted several companies to relocate offices to the area. In 2014, Big-D Construction commenced construction on the Traverse Mountain Office Building #2 project.

The Design-Build project included the core and shell of the 4-story, 210,000 square-foot office building. The office building features a modern design that incorporates floor-to-ceiling windows that provide natural light, as well as panoramic views of Mount Timpanogos and the surrounding valley. Next to the office building is a parking structure that includes 1,000 stalls for employees and guests. Big-D also completed associated site work. Construction took less than 2 years to complete.