fbpx Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter Asset 1 Self Performed Building 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Self-Performed Services single-blue-chevron-left Office Signature double-blue-chevron-left Light Commercial single-chevron-gray-left single-white-chevron-left solid arrow right
Project Molycorp B26 Truck Shop Addition
Owner Molycorp


Project Size

13,500 sq ft

Project Dates

4 months

Project Location

Mountain Pass, CA
Molycorp

Project Description

The 13,500-square-foot truck shop addition project for Molycorp included site preparation and relocating existing underground power lines. Big-D Construction self-performed all concrete on the project. The addition was a prefabricated metal building.