fbpx Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter Asset 1 Self Performed Building 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Self-Performed Services single-blue-chevron-left Office Signature double-blue-chevron-left Light Commercial single-chevron-gray-left single-white-chevron-left solid arrow right
Project Marigold Mine Truck Wash
Owner Goldcorp/Barrick Gold Corporation


Project Size

9,150 sq ft

Project Dates

7 months

Project Location

Valmy, NM
Goldcorp/Barrick Gold Corporation

Project Description

Marigold Mine commenced operations in 1988. Budgeted mine production for 2010 was over 57 million tons. In order to facility the mine growth for Marigold, Big-D was contracted to construct this new 9,150-square-foot truck wash facility. Big-D Construction performed the majority of the construction work for Marigold Mine during the harsh Northern Nevada winter. While performing under these conditions, Big-D managed to complete the project with no lost time injury (LTI) accidents or medical attention incidents with over 9,300 man-hours worked.