fbpx Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter Asset 1 Self Performed Building 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Self-Performed Services single-blue-chevron-left Office Signature double-blue-chevron-left Light Commercial single-chevron-gray-left single-white-chevron-left solid arrow right
Project Kennecott Utah Copper Mine Pebble Crusher
Owner Kennecott Utah Copper


Project Size

4,500 cubic yards

Project Dates

18 months

Project Location

Bingham Canyon, UT
Kennecott Utah Copper

Project Description

The Pebble Crusher was a concrete and excavation contract to place over 4,500 cubic yards of concrete footings and foundations at the Kennecott Utah Copper concentrator, including a 2,200 cubic-yard crusher foundation and a three-foot thick mat slab footing. There were also over 50 other separate footings and foundations for conveyors, steel structures and three small buildings on the Kennecott property.

One of the major challenges of this project was the placement of large quantities of concrete during the winter at a high elevation. It was also built during a time of cement shortages. Big-D Construction used its longstanding relationships with concrete suppliers to secure sufficient concrete to keep the project moving on schedule. In addition, the work had to be completed without interfering with the operation of the adjacent concentrator.