Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 Office double-blue-chevron-left Light Commercial Self Performed Building Self-Performed Services Signature single-blue-chevron-left BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter
Project Patterson Fulfillment Center
Owner


Project Size

1,556,000 sq ft*

Project Dates

10 months

Project Location

255 Park Center Drive Patterson, CA

Project Description

In 2012 Big-D faced a construction challenge: build a 1.6-million-square-foot fulfillment center that can accommodate a robotic picking system, and do it in ten months. So that’s what our crews accomplished.

The Patterson Fulfillment Center, completed in September 2013, has a 1,106,000-square-foot fulfillment center with a 450,000-square-foot mezzanine*. The exterior is made up of concrete tilt-up panels and the roof is a single-ply TPO membrane over an open web joist/metal deck roof structure. Big-D performed extensive and complex electrical work: the building has five electrical services totaling 15,000 AMPs. The Patterson Fulfillment Center is fully climate-controlled and includes high-efficiency lighting controlled by photocells and motion sensors.

Patterson, California, is a small city in central California that competes with neighboring cities for business development. Although our project spurred significant curiosity and speculation in the community, Big-D exercised utmost discretion per our client’s request.

*1,106,000 square foot shell and floor, 450,000 square foot mezzanine