Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 447C23C2-7781-4D65-A1D1-2E0A82B68765 Created with sketchtool. 6E5B9159-593C-4C50-A6CE-E75D21E41519 Created with sketchtool. Office double-blue-chevron-left Light Commercial Self Performed Building Self-Performed Services Signature single-blue-chevron-left single-chevron-gray-left single-white-chevron-left BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter solid arrow right Asset 1
Project Kennecott Utah Copper Truck Shop Expansion
Owner


Project Size

106,000 sq ft

Project Dates

22 months

Project Location

Bingham Canyon, UT

Project Description

Kennecott Copper Mine, the largest open-pit mine in the world, uses unique equipment including enormous ore trucks. Maintaining these trucks is a process in and of itself, and Kennecott has a dedicated space for that process. In 2011, Big-D began construction of a 106,000-square-foot expansion to the existing mine truck maintenance shop for Kennecott. The addition included 16 new offices, 12 service and repair bays, two tire service bays, four overhead cranes, a storage building, and a changing building. The building not only provides the space for administrative work, but also accommodates Kennecott’s 300-ton dump trucks during repair and maintenance.

Big-D also built a new warehouse portion to supply the expanded shop with parts and a new house to accommodate the existing and added workforce. Our construction management team worked closely with Kennecott and the designer in a Construction Manager/General Contractor delivery method, providing budgets and constructability reviews during design.