Project Kennecott Utah Copper Mine Dispatch Building
Owner
More
Project Details

Project Size

2,000 sq ft

Project Dates

5 months

Project Location

Bingham Canyon, UT
  • 2007 ABC Utah’s Excellence in Construction awards for Industrial Project

Project Description

Built at the top lip overlooking the Kennecott Utah Copper Mine, this 5,000-square-foot dispatch building is the control tower of the entire mine operation.

The Kennecott Mine dispatch building includes a break room, offices, restrooms, a conference room and a dispatch control room. The building overlooks the Kennecott Mine to give the dispatchers a bird’s eye view of the pit in operation. The building was completed as part of the Giant Leap Project and finished in four months.