Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 Office double-blue-chevron-left Light Commercial Self Performed Building Self-Performed Services Signature single-blue-chevron-left BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter
Project FedEx Salt Lake International Airport
Owner Preferred Realty & Development Co.


Project Size

70,908 sq ft

Project Dates

8 months

Project Location

Salt Lake City, UT
Preferred Realty & Development Co.

Project Description

Due to the redevelopment of the Salt Lake City International Airport, FedEx relocated from the space they were previously in at the airport. FedEx also consolidated operations from two other locations into the new building. Big-D Construction was hired as a design-build partner to create a faculty that would duplicate FedEx’s nation-wide package and sorting layout.

With the utilization of highly technical and specialized sorting machinery, the new FedEx airport facility was constructed free of interior columns. A maintenance shop for repair of machinery transportation vehicles and airplanes, along with offices, is also included within the open facility. Big-D crews self-performed all of the concrete work on this 70,908 a concrete tilt-up structure located in the North Cargo Area of the Salt Lake International Airport.