Calendar1 Calendar2 single-blue-chevron-left single-chevron-gray-left Asset 1 Office double-blue-chevron-left Light Commercial Self Performed Building Self-Performed Services Signature single-blue-chevron-left BigD-Facebook BigD-Instagram BigD-LinkedIn BigD-Twitter
Project Esurance Service Center Tenant Improvement
Owner


Project Size

67,600 sq ft

Project Dates

4 month

Project Location

1010 South Depot Drive, Ogden, UT

Big-D Construction built the core and shell as part of the BDO 1010 project and then competitively bid the Esurance Serice Center Tenant Improvement and was awarded the contract.

Project Description

The tenant improvement consists of all finishes including concrete slabs on release membrane, millwork in break rooms, HM doors/frames, wood doors/aluminum frames, metal stud framing and drywall, ceramic tile at restrooms, Techzone ceilings, carpet tile installation, VCT and rubber base, painting, access flooring installation, operable partition in the training room, toilet and bath accessories, metal lockers, kitchen appliances, projection screens, window treatments, fire protection system, mechanical systems and electrical systems.